Rail
Our consultant coaches have helped clients to:
- Improve mean distance between failure on old rolling stock. From 3126 miles to 6200 miles over 12 week period
- Improve bids process and implement lean in a commercial environment
- Design and implement organisation design project on rail maintanance depot
- Reduce exam times by 50% and established standardised work
- Reduce "coupler faults" saving on penalty costs
- Reduce door defects from 52/month down to 7
- Reduce engine change times by 54%
- Reduce SPAD faults